Get free quotes

Plans, certificates & surveys

Get the plans through council before the first trench is dug

Free quotes from architects, plan drawers and planners across South Africa. One request, no obligation.

A neat stack of building plan sheets and a folder of forms on a municipal office counter in Pretoria
Notice of application
Section 7Approval under the Act
Approved before you buildRef LUA/BUI/227

At a glance: Building Plan ApprovalLUA/BUI/227

Suits
Owners, builders and developers
How it works
Submission to building control
Range
One addition to a full development
Check first
The Act, SANS 10400 and the zoning
Lead time
Act sets 30 or 60 days, often longer

Building plan approval is the municipality's permission to build what is on your plans. Under section 4 of the National Building Regulations and Building Standards Act, 103 of 1977, no building may be put up without it. The municipality checks the plans against the building regulations, the zoning scheme and the title deed, and either approves or refuses them. This page covers the submission, the documents, how long it takes, why plans come back and what happens after approval. Send one request and plan drawers and architects who submit in your area quote you.

Submitting your plans

Most metros and many towns now take building plans online; others still accept paper sets at the building control office. A typical submission includes:

  • the plans drawn by a SACAP registered person
  • the title deed and the SG diagram of the erf
  • a zoning certificate
  • a power of attorney if someone submits for the owner
  • the engineer's appointment and completion forms where structure is involved
  • energy calculations or forms under SANS 10400-XA
  • the plan fee from the municipality's tariff list

Check the municipality's own checklist before you submit: each has its own forms, and an incomplete set is often not accepted for assessment at all, which means the clock does not start until the missing item arrives.

What the municipality checks, and how long it takes

The plans are circulated to the departments concerned: town planning for zoning, building control for the regulations, and often fire, roads, stormwater, water and sewer. Heritage or environmental comment may be needed for older buildings or sensitive sites (see heritage applications). Under section 7, the Act sets 30 days for buildings under 500 m² and 60 days for larger ones, although many municipalities take longer in practice, especially when plans are sent back with queries.

If one department has a query, the plans may be returned for amendment and resubmitted, and the assessment starts again for the changed sheets. Answering queries quickly and completely is the part of the timeline you can control.

Common reasons plans are refused or sent back

  • building over a building line without a relaxation
  • coverage, floor area or height above what the zoning allows
  • a title deed condition the design ignores
  • missing documents, signatures or engineer's forms
  • energy, fire or drainage details that do not meet SANS 10400
  • a use that the zoning does not permit

Some of these need a planning application first, so ask early whether your design fits the rules. A plan drawer who knows the local scheme will usually spot these before submission, and a town planner can handle any application the design needs.

Inspections and the occupancy certificate

Approval is not the end. Building control officers inspect at stages, such as foundations and drainage, so tell the municipality when work reaches them. When the building is finished, the engineer and other competent persons submit their completion certificates, and the municipality issues an occupancy certificate under section 14. Keep it with the approved plans: buyers, banks and conveyancers ask for both. If something was built without approval, see as-built plans.

What to put in your request

  • Whether the plans are drawn already or still needed
  • The erf number and the municipality
  • The floor area of the new building work
  • Any building line, height or coverage concerns
  • Whether the municipality has sent queries already

Building Plan Approval for owners, buyers, businesses and developers

  • Homeowners: getting an addition, carport or granny flat approved before the builder starts
  • Developers: approval of plans for each unit once the rezoning and SDP are in place
  • Home businesses and guest houses: approved plans for alterations needed for a shop, office or guest house
  • Owners of farms, plots and vacant land: approval for a farmhouse, store or staff housing where the municipality requires it
  • Buyers, sellers, agents and conveyancers: checking that the house on offer matches the approved plans and occupancy certificate
  • Companies, shops and industry: approval for new offices, warehouses, shopfitting and fire upgrades
  • Schools, churches, clinics and NPOs: approval of plans for halls, classrooms, clinics and sports facilities
  • Architects, plan drawers and builders: someone to manage the submission and queries on an architect's behalf
  • Neighbours and residents' associations: checking whether a neighbour's building work has approved plans

Frequently asked questions

How long does building plan approval take?
The Act sets 30 days for buildings under 500 m² and 60 days for larger ones, although many municipalities take longer in practice. Incomplete submissions and plans that need a relaxation or other application take longer, so ask the plan drawer what to expect locally.
Who approves building plans?
The municipality where the property is, through its building control department, which circulates the plans to planning and other departments before the decision.
Can I start building before approval?
No. Section 4 of the Act says no building may be erected without the municipality's approval. Building without it can lead to a stop notice, penalties and costly changes later.
Do you submit building plans for me?
No. We pass your request to independent plan drawers, architects and town planners in your area who prepare and submit plans, and they quote you directly.

Building Plan Approval by province and city

More planning applications, plans and studies

Free quote request, no obligation

Request quotes for building plan approval

Fill in the form the way a planner would open a new file: the size of the erf, its zoning now and what you want it to become, how many portions or units and the floor area, or simply how many certificates, surveys or objections. Registered planners, plan drawers, surveyors and consultants in your area quote you directly.

Land use and plans: request formBuilding Plan Approval
File
49001
Date
2026-11-17
Fee
Free

1The job

2The property (optional, it helps the quote)

The erf in plannot to scale

-
-
-
-
-
-
Estimate
-

Plain arithmetic for the request, not a zoning assessment.

3Where you are now

4Your list (optional)

  1. 01
  2. 02
Up to 12 lines: applications, plans, certificates, surveys or studies.
Needs and options

5Your details

Free and no obligation. By sending you agree that we may share your request with suitable town planners, plan drawers, surveyors and consultants. See our privacy policy.

Get free town planning quotes